Expand group
PUD Fiber
SkyFi
TV
The Public Utility District No. 1 of Okanogan County will be performing service affecting maintenance on fiber located along Okoma Dr in Omak beginning on Wednesday, June 24, 2026 at 2300 and concluding Thursday, June 25, 2026 by 0500.
Severity: Service Affecting
Scope of Work: Fiber splicing
Kitsap PUD will be working on the Ponderosa Cabinet in the Hansville area on June 24th. This will be service affecting for Tamarack Dr and Ponderosa Blvd in Hansville from 8am until noon.
Outage to accommodate construction on Red Apple Rd. Fiber services will be down for the duration of the overnight maintenance.
As of 7:44pm yesterday, 06/25, Fire crews had the fire 100% contained, with all road closures and evacuation orders for the area removed. All three of the affected fiber Hubs (95, 229, 230) in the region are back online as of now; this outage is fully resolved.
Most recent update from the National Interagency Fire Center from 8:15pm yesterday, 06/24, states the fire is 61% contained. However, it is still too dangerous for Grant PUD crews to dispatch. There are ongoing outages near Coulee City as a result of this. Still no ETR at this point, from either Fire crews or PUD crews.
According to Grant PUD, Hubs 95, 229, and 230 are currently offline. A fire that had been mostly contained as of last night (06/21) re-ignited and jumped Highway 17. At this time, PUD crews have no Estimated Time to Resolution (ETR) for any customers receiving service from those hubs. Once the fires are extinguished and conditions are safe for PUD crews, they will be dispatching to inspect fiber lines for damage and repairs. At that time, emergency maintenance will likely be needed to replace any damaged lines.
Kitsap PUD will be performing service affecting maintenance on 6/18 starting at 1am and ending at 5am in Poulsbo.
5/26/26- Kitsap PUD needed to move this up from June 18th to June 17th.
Due to complications at the work site this maintenance is still ongoing. No ETR at this time.
This service affecting maintenance will start at 1am on May 29th and will end at 5am on May 29th in Bremerton. The duration of the outage will be 3hrs. During this maintenance, KPUD is being forced to relocate fiber by DOT.
Chelan PUD has scheduled emergency maintenance on 5/27 from 10am-8pm in the No 2 Canyon area of Wenatchee to repair damaged fiber due to a squirrel chew.
Construction of a roundabout at the intersection of Okanogan and Crawford requires all utility services passing through this intersection to be rerouted.
Construction of a roundabout at the intersection of Okanogan and Crawford requires all utility services passing through this intersection to be rerouted. This is the first of two outages required to re-route fiber optic services.
LocalTel has scheduled Telecom Network Maintenance on Tuesday, May 19th from 3:00AM-4:00AM.
Purpose:
Upgrade OLT software on the following OLTs
College, Sunnyslope,
Squilchuck, Saddlerock, Wenatchee
DATE:
04/23/2026 - 04/24/2026
Time:
11:00 PM – 04/23/2026 - Start
06:00 AM 4/24/2026 - End
Impact:
15-20 Min outage on each OLT while we upgrade the software.
MASON PUD 3 SERVICE AFFECTING WORK SCHEDULED FOR 4/22/2026
Mason PUD 3 has scheduled service affecting work for 4/22/2026. This work will start at 01:00am and will continue through the day until mid to late afternoon.
This work is service affecting for the roads listed below -
Prairie Lp RD
Fairway Dr
Blakely Dr
W Star Lk Dr
W Lolo Pl
Quinault Trl
W Hoquiam Trl
W Satsop Cloq Rd
W Hamma Hamma Dr
W Dosewallips Tr
W Tulalip Tr
W Chinook Ct
W Tipi Ct
W Cloquallum Rd
W Chimacum Dr
W Arrowhead Dr
W Hoko Pl
W Thunderbird Dr
W Hoh Circle
Kiowa Pl
W Star Pt Way
W Totem Dr
W Tyee Pl
W Bulb Farm Rd
W Lost Lk Rd
W Lost Lk Vw Dr
W Lost Lk Pk Ct
W Frosty Ln S
W Lake Forest Ln W
W Lake Forest Ln E
W Lakeside Dr
W White Rd
Per Grant PUD: The power disruption caused by the pole fire has been resolved and fiber services are operating as expected.
A pole fire in Ephrata has caused an internet service disruption. At this time there is not estimated time to restore service, but we will communicate one as soon as it's available.
Chelan PUD Manson Maintenance Today 4/15/26 8AM-5PM
The total affected customers is 16
NoaNet will be performing maintenance in Davenport that will affect Fiber and Wireless services.
Date of Work: April 14, 2026 - April 14, 2026
Time of Work: 0100-0500 PDT
Est. Outage Duration: Up to 4 Hours
Apr 2026 to Jun 2026
Next